155 bed student accommodation development. It’s of mixed construction with a steel frame and concrete deck podium at ground floor with a 6 storey timber frame construction above.
We were appointed to carry out Building Control & Building Testing Services.
Building Designed and Awarded BREEAM Outstanding.
- Contract Period 51 weeks
- Build Costs £7 million
- Started 12/2015
- Completed 12/2016
- Contractor CPUK Group